Update issues to move them to the backlog
Move issues to the backlog. This operation is equivalent to remove future and active sprints from a given set of issues. At most 50 issues may be moved at once.
POST
/agile/1.0/backlog/issueAuthorization
AuthorizationBasic auth · headerrequiredIn order to use basic authorization, provide username:password Base64 encoded in the 'Authorization' header.
Request body
requiredapplication/jsonThe issues to move to the backlog.
issuesstring[]Responses
204
Empty response is returned if operation was successful.
400
Returned if the request is invalid.
401
Returned if the user is not logged in.
403
Returned if user does not a have valid license or does not have permission to assign issues.
404
Returned if sprint does not exist or the user cannot view it.